Case Study
East Kilbride Leisure Hub
Main Contractor: Interserve Construction Limited
Value: £5million
Start Date: January 2016 End Date: November 2016
Scope of Works:
Emtec Building Services were contracted to provide full mechanical, plumbing and electrical services installation for the complete refurbishment of the existing East Kilbride Ice Rink and Olympia Mall to create the new “East Kilbride Leisure Hub”.
The EK Hub consists of a new Ice Rink, Arial Adventure climbing/activity centre and surrounding restaurant areas. The existing mall required to remain fully operational throughout the duration of the works requiring a coordinated programme / phasing approach to delivery.
Summary of Service:
LV switchgear and distribution
Fire alarm /vesda
AHU / Vent installation
Architectural lighting installation
PA/VA ice rink sound system
Underfloor heating c/w screed
Lighting controls
General and specialist power
Sprinkler system
Lighting and emergency lighting
LTHW / DWS / Gas installation
Automatic controls / integration
Boiler house & plant room installations
AGD & sanitary ware installation
Thermal insulation